SAP C_TS452_2020 Dumps

83 questions3.0 (2 ratings)105 viewsby Dutton Training

C_TS452_2020 SAP Certified Application Associate - SAP S/4HANA Sourcing and Procurement

How it works

  • • One question per screen, at your own pace
  • • No time limit
  • • Instant feedback right after each question
  • • Explained review of every question
  • • Free, no account needed

Quiz details

Topic
Tecnologia
Questions
83
Time
No time limit
Author
Dutton Training
Updated on
10/6/2026
Subjects
Geral

Question preview

Check the first 10 questions. Answers are revealed only when you take the quiz.

  1. 1 · Geral

    While procuring material from another plant. Which purchasing instrument would you use?

    • A)Normal Procurement process
    • B)Standard purchase order
    • C)STO
    • D)Extended ware house
  2. 2 · Geral

    2. You have to post scrap expenses to a special account. Based on which characteristics can you influence the behaviour of the account determination? Note: There are 2 correct answers to this question

    • A)Plant
    • B)Movement type
    • C)Storage location
    • D)Stock type
  3. 3 · Geral

    While creating a blanket purchase order using item category B. Which tab becomes visible on the PO in this process?

    • A)MRP
    • B)Storage location
    • C)Confirmations
    • D)Limits
  4. 4 · Geral

    What do you need to do if you want MRP live to create planned orders for externally procured materials?

    • A)Implement BAdl PPH_MRP_SOURCING_BADI => SOS_DET_ADJUST
    • B)Set the MRP indicator in the source list of the material to "Not relevant for planning".
    • C)Set the appropriate plant-specific material status
    • D)Change the procurement type of the material
  5. 5 · Geral

    5. Which SAP Fiori design principle has the goal of having one user. one use case, and up to three screens for each application?

    • A)Simple
    • B)Responsive
    • C)Role-based
    • D)Value
  6. 6 · Geral

    The invoice verification clerks are working with the Release Blocked Invoices app. kind of blocked invoices can they use the automatic release function on what basis?

    • A)Invoices blocked automatically
    • B)Invoices blocked due to variances
    • C)Invoices blocked because of an excessive amount
    • D)Invoices blocked manually
  7. 7 · Geral

    Do you maintain the purchasing group in the material master on the following level?

    • A)MRP
    • B)Plant
    • C)Purchasing Requistion
    • D)Client
  8. 8 · Geral

    You want to create a purchase order with reference to a purchase requistion . What controls the linkage between the line item of your purchase order and the purchase requisition ?

    • A)a. Document category
    • B)b. User role
    • C)Document type
    • D)Account assignment
  9. 9 · Geral

    What are some options when working with scheduling agreements? Note: There are 3 correct answers to this question.

    • A)Item category M (Material unknown) can be used in a scheduling agreement.
    • B)A scheduling agreement item is always plant-specific.
    • C)A scheduling agreement can be used for a consignment process.
    • D)Scheduling agreement delivery schedule lines can only be created manually.
    • E)A material master record is optional in a scheduling agreement item.
  10. 10 · Geral

    Your purchasing department works with purchasing info records. You create a purchase order. Which logic does the system use to propose a valid price that is stored in the info record?

    • A)If a valid plant-specific price exists, this is proposed when a purchase order is created for the corresponding plant.
    • B)The system always proposes the price from the last purchase order whose number was copied into the info record
    • C)If there are NO valid conditions maintained in the info record, the system can propose the price from the last purchase order
    • D)The system always proposes the price from the purchasing organization level, if available

And 73 more questions waiting for you.

How to study with this quiz

Simulate the real exam

Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.

Learn from mistakes

In the review, focus on the questions you missed and understand why the correct answer is right.

Retake to consolidate

Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.