PMP Project Management Professional v2020 2

80 questions drawn from 49913 viewsby Dutton Training

PMP Project Management Professional v2020 2

How it works

  • • One question per screen, at your own pace
  • • No time limit
  • • Instant feedback right after each question
  • • Explained review of every question
  • • Free, no account needed

Quiz details

Topic
Tecnologia
Questions
499
Time
No time limit
Author
Dutton Training
Updated on
10/16/2026
Subjects
Geral

Question preview

Check the first 10 questions. Answers are revealed only when you take the quiz.

  1. 1 · Geral

    Configuration identification, configuration status accounting, and configuration verification and audit are all activities in which process?

    • A)Perform Quality Assurance
    • B)Direct and Manage Project Work
    • C)Monitor and Control Project Work
    • D)Perform Integrated Change Control
  2. 2 · Geral

    Which tool or technique is used in the Estimate Costs process?

    • A)Acquisition
    • B)Earned value management
    • C)Vendor bid analysis
    • D)Forecasting
  3. 3 · Geral

    Which tool or technique is used in the Perform Integrated Change Control process?

    • A)Decomposition
    • B)Modeling techniques
    • C)Resource optimization
    • D)Meetings
  4. 4 · Geral

    Which type of contract gives both the seller and the buyer flexibility to deviate from performance with financial incentives?

    • A)Cost Plus Incentive Fee (CPIF)
    • B)Fixed Price Incentive Fee (FPIF)
    • C)Cost Pius Award Re (CPAF)
    • D)Time and Material (T&M)
  5. 5 · Geral

    The degree, amount, or volume of risk that an organization or individual will withstand is known as its risk:

    • A)Analysis
    • B)Appetite
    • C)ToleranceD. Response
  6. 6 · Geral

    During which process does the project team receive bids and proposals?

    • A)Conduct Procurements
    • B)Plan Procurements
    • C)Estimate Costs
    • D)Control Budget
  7. 7 · Geral

    Which output is the approved version of the time-phased project budget?

    • A)Resource calendar
    • B)Scope baseline
    • C)Trend analysis
    • D)Cost baseline
  8. 8 · Geral

    The purpose of the Project Communications Management Knowledge Area is to:

    • A)Monitor and control communications throughout the entire project life cycle.
    • B)Maintain an optimal flow of information among all project participants.
    • C)Develop an appropriate approach for project communications.
    • D)Ensure timely and appropriate collection of project information.
  9. 9 · Geral

    Specification of both the deliverables and the processes is the focus of:

    • A)Change control
    • B)Configuration control
    • C)Project monitoring and control
    • D)Issue control
  10. 10 · Geral

    Which key interpersonal skill of a project manager is defined as the strategy of sharing power and relying on interpersonal skills to convince others to cooperate toward common goals?

    • A)Collaboration
    • B)Negotiation
    • C)Decision making
    • D)Influencing

And 489 more questions waiting for you.

How to study with this quiz

Simulate the real exam

Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.

Learn from mistakes

In the review, focus on the questions you missed and understand why the correct answer is right.

Retake to consolidate

Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.