C_TS422_2020 SAP S/4HANA Production Planning and Manufacturing

80 questions180 min0.0 (15 ratings)121 viewsby Dutton Training

SAP Cerification Dumps C_TS422_2020 SAP S/4HANA Production Planning and Manufacturing

How it works

  • • One question per screen, at your own pace
  • • Total time of 180 minutes
  • • Instant feedback right after each question
  • • Explained review of every question
  • • Free, no account needed

Quiz details

Topic
Tecnologia
Questions
80
Time
180 min
Author
Dutton Training
Updated on
10/31/2026
Subjects
Geral

Question preview

Check the first 10 questions. Answers are revealed only when you take the quiz.

  1. 1 · Geral

    How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question

    • A)Use quotations for internal and external procurement.
    • B)Use stock transfer reservations for stock transfer.
    • C)Use purchasing costs for automated source prioritization.
    • D)Use purchase orders for external procurement.
    • E)Use run schedule quantities for in-house production.
  2. 2 · Geral

    When can the automatic material availability check occur in a production order? Note: There are 2 correct answers to this question.

    • A)At order release
    • B)At order settlement
    • C)At order creation
    • D)At order confirmation
  3. 3 · Geral

    Which business processes are affected by settings in the order type- dependent parameters? Note: There are 2 correct answers to this question.

    • A)Implement engineering changes.
    • B)Initiate quality inspections
    • C)Select master data.
    • D)Define integration to cost accounting
  4. 4 · Geral

    You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

    • A)Planning without final assembly (50)
    • B)Make-to-order production (20)
    • C)Planning with final assembly (40)
    • D)Planning at assembly level (70)
  5. 5 · Geral

    How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question

    • A)Order-related
    • B)Cost-related
    • C)Milestone-related
    • D)Product-related
  6. 6 · Geral

    Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.

    • A)Bulk materials
    • B)Waste products
    • C)Co-products
    • D)By-products
    • E)Continuous flow materials
  7. 7 · Geral

    What is a work center hierarchy in capacity planning in SAP S/4HANA?

    • A)A group of work centers in a production line being used in sequence for production
    • B)A group of alternative work centers providing a cumulative available capacity for production
    • C)A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
    • D)A group of alternative work centers for production, structured in hierarchy levels by priorities
  8. 8 · Geral

    Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

    • A)When multiple operations are maintained for one product
    • B)When multiple production versions are maintained for one product
    • C)When alternative resources are used within one operation
    • D)When multiple planned orders exist on one resource
  9. 9 · Geral

    Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

    • A)Order (pool) chart
    • B)Capacity requirements chart
    • C)Orders (dispatched) chart
    • D)Work center capacities chart
  10. 10 · Geral

    Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

    • A)Run PP/DS heuristics for repetitive manufacturing.
    • B)Assign planned orders manually in the planning table
    • C)Run MRP with quota arrangement
    • D)Run MRP with automatic selection of production version

And 70 more questions waiting for you.

How to study with this quiz

Simulate the real exam

Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.

Learn from mistakes

In the review, focus on the questions you missed and understand why the correct answer is right.

Retake to consolidate

Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.