C_TS413_2020 SAP S/4HANA Asset Management

80 questions0.0 (13 ratings)38 viewsby Dutton Training

C_TS413_2020 - SAP Certified Application Associate - SAP S/4HANA Asset Management

How it works

  • • One question per screen, at your own pace
  • • No time limit
  • • Instant feedback right after each question
  • • Explained review of every question
  • • Free, no account needed

Quiz details

Topic
Tecnologia
Questions
80
Time
No time limit
Author
Dutton Training
Updated on
10/20/2026
Subjects
Geral

Question preview

Check the first 10 questions. Answers are revealed only when you take the quiz.

  1. 1 · Geral

    Which SAP UI technology is used for the technicianIs job list?

    • A)Web Dynpro
    • B)Web Dynpro
    • C)SAP GUI for Windows
    • D)SAP GUI for HTML
  2. 2 · Geral

    Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

    • A)In the report Material: Where-Used List
    • B)In the material reservation list in inventory management
    • C)In the single-level list editing function for maintenance orders
    • D)Within a maintenance order
  3. 3 · Geral

    Which statement is correct when planning maintenance work thatis to be carried out by an external company?

    • A)A service master record must always be assigned to the externalorder operation
    • B)In the control key assigned to the order operation, the "Service" indicator must always be activated.
    • C)If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.
    • D)If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  4. 4 · Geral

    Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers tothis question.

    • A)SAP Fiori launchpad only supports SAP UI5 apps.
    • B)SAP GUI transactions can be used in the SAP Fiori launchpad.
    • C)The cloud version can also use SAP GUI for Windows.
    • D)Web Dynpro apps can be used in the SAP Fiori launchpad.
  5. 5 · Geral

    Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question.

    • A)Analyze overdue maintenance orders that have NOT been finally confirmed.
    • B)Display approved purchase requisitions for which NO purchase orders have been generated.
    • C)Display approved purchase requisitions for which purchase orders have been generated.
    • D)Analyze maintenance orders that are still in planning andhave NOT been released.
    • E)Analyze confirmed maintenance orders that have NOT been settled.
  6. 6 · Geral

    What do you need to configure to enable entries in the action log ofan equipment?

    • A)Activate the change documents for the equipment category
    • B)Select the time segment check box for the equipment category.
    • C)Define an additional business view for the equipment category.
    • D)Define the corresponding history-related field for the equipment reference category.
  7. 7 · Geral

    How do you map a counter replacement in SAP S/4HANA Asset Management?

    • A)Create a new measurement document marked as a counter replacement.
    • B)Deactivate the current counter and create a new counter.
    • C)Create a new measurement document and assign a valuationcode for counter replacement.
    • D)Replace the defective piece of equipment to which a counter is assigned.
  8. 8 · Geral

    You want to have several plan dates calculated in a maintenanceplan. Which scheduling parameter do you use?

    • A)Call horizon
    • B)Scheduling period
    • C)Scheduling indicator
    • D)Lead float
  9. 9 · Geral

    The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

    • A)All open reservations are closed when the maintenance order isset to TECO
    • B)Reservations are created only after a material availability checkhas been performed
    • C)For the combination of order type and planner group you can decide when reservations are created
    • D)Open reservations can be cleared when a maintenance order operation is finally confirmed.
  10. 10 · Geral

    You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

    • A)Assign a subordinate piece of equipment.
    • B)Create a measuring point.
    • C)Change a reference location
    • D)Edit classification data and characteristics.
    • E)Assign documents.

And 70 more questions waiting for you.

How to study with this quiz

Simulate the real exam

Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.

Learn from mistakes

In the review, focus on the questions you missed and understand why the correct answer is right.

Retake to consolidate

Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.