C_S4EWM_2020 Extended Warehouse Management with SAP S/4HANA

80 questions180 min0.0 (21 ratings)153 viewsby Dutton Training

Free dumps C_S4EWM_2020 Extended Warehouse Management with SAP S/4HANA

How it works

  • • One question per screen, at your own pace
  • • Total time of 180 minutes
  • • Instant feedback right after each question
  • • Explained review of every question
  • • Free, no account needed

Quiz details

Topic
Tecnologia
Questions
80
Time
180 min
Author
Dutton Training
Updated on
10/30/2026
Subjects
Geral

Question preview

Check the first 10 questions. Answers are revealed only when you take the quiz.

  1. 1 · Geral

    Where do you enable opportunistic cross-docking?

    • A)In the warehouse and the product
    • B)In the warehouse and the document type
    • C)In the product and the warehouse process type
    • D)In the product and the storage type
  2. 2 · Geral

    Which of the following actions are possible based on a value-added service (VAS) order? Note: There are 3 correct answers to this question.

    • A)Capture time required.
    • B)Capture costs.
    • C)Assemble a kit.
    • D)Consume auxiliary products.
    • E)Perform quality inspection
  3. 3 · Geral

    What are the key fields used to define a delivery document in SAP Extended Warehouse Management customizing? Note: There are 2 correct answers to this question.

    • A)System profile
    • B)Document type
    • C)Document category
    • D)Warehouse number
  4. 4 · Geral

    What is a custodian in SAP EWM? Note: There are 2 correct answers to this question.

    • A)It is a supply chain unit.
    • B)It is required for the creation of the warehouse.
    • C)It is a warehouse attribute.
    • D)It is part of the stock information
  5. 5 · Geral

    For quality inspections in decentralized SAP EWM with QM integration, you need a quality inspection rule and the inspection setup in the material master. How can you simplify the master data creation?

    • A)Create the quality inspection rule and distribute it to create the inspection setup in the material master.
    • B)Use the inspection object type 07.
    • C)Use the inspection type 01.
    • D)Create the inspection setup in the material master and distribute it to create the quality inspection rule
  6. 6 · Geral

    What do you control with an activity area? Note: There are 2 correct answers to this question.

    • A)The area in which a resource will work in the warehouse
    • B)The stock search sequence during warehouse task creation for picking
    • C)The doors that can be connected to a staging area
    • D)The size or volume of a warehouse order
  7. 7 · Geral

    What scenario can be controlled with the storage locations Received on Dock (ROD) and Available for Sale (AFS).

    • A)Distinguish material that is in quality inspection from material that is unrestricted
    • B)Distinguish material that belongs to the vendor from own stock
    • C)Distinguish material quantities that are assigned to a sales order
    • D)Distinguish material that is still in inbound processing from material that has reached the final bins
  8. 8 · Geral

    What do you influence with a resource group definition?

    • A)The horizontal and vertical speed of a resource
    • B)The menu on the user's mobile device
    • C)The work environment of the resource (either radio frequency or non-radio frequency)
    • D)The queues a resource should process
  9. 9 · Geral

    Which of the following are product warehouse tasks during putaway with process-oriented storage control?

    • A)The first process step
    • B)The final process step
    • C)The first and final process step
    • D)All process steps
  10. 10 · Geral

    For which processes can you create a direct outbound delivery order? Note: There are 3 correct answers to this question.

    • A)Scrapping
    • B)Replenishment
    • C)Inventory difference
    • D)Issue to cost center
    • E)Direct sales

And 70 more questions waiting for you.

How to study with this quiz

Simulate the real exam

Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.

Learn from mistakes

In the review, focus on the questions you missed and understand why the correct answer is right.

Retake to consolidate

Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.