Certification Dumps C_TPLM40_65 SAP QM
Certification Dumps C_TPLM40_65 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 EHP5
How it works
- • One question per screen, at your own pace
- • Total time of 180 minutes
- • Instant feedback right after each question
- • Explained review of every question
- • Free, no account needed
Quiz details
- Topic
- Tecnologia
- Questions
- 118
- Time
- 180 min
- Author
- Dutton Training
- Updated on
- 10/30/2026
- Subjects
- Geral
Question preview
Check the first 10 questions. Answers are revealed only when you take the quiz.
1 · Geral
The audit plan is hierarchically structured.
- A)Correct
- B)Incorrect
2 · Geral
The BAPI technology allows the customer to implement customer-specific selection and mapping procedures.
- A)Correct
- B)Incorrect
3 · Geral
In inspection planning, you create material-related information that is used when this material is inspected.
- A)Incorrect
- B)Correct
4 · Geral
An activity consists of the following elements (more than one answer is true):
- A)Long text
- B)Processing quality factor
- C)Short test
- D)Processing deadlines
- E)Catalog entry
5 · Geral
The work performed and costs incurred during results recording or when the usage decision is made can be confirmed in a QM order.
- A)Using direct activity allocation
- B)In cost processing
6 · Geral
In which of the following you can display the information for multiple specifications functions and valuate them at characteristic level:
- A)Results Recording Worklist
- B)Record inspection results for the batch
- C)Record inspection results for the lot
- D)Record inspection results for the inspection point
- E)Record inspection results for the operation
7 · Geral
Notification category 05 belongs to:
- A)Service notifications
- B)General notifications
- C)Claim notifications
- D)Quality notifications
- E)Maintenance notifications
8 · Geral
A notification item consists which of the following elements? (More than one answer is true.)
- A)AssemblyBill of material item
- B)Catalog entry for defect location
- C)Number of defects identified
- D)Catalog entry for defect type (defect class)
9 · Geral
You can use the Quality Notifications to support the RMA (Return Material Authorization) process in your company.
- A)Incorrect
- B)Correct
10 · Geral
These are prerequisites to inspection lot creation: - The inspection type is active in the material master - QM is active in the table of movement types
- A)Incorrect
- B)Correct
And 108 more questions waiting for you.
How to study with this quiz
Simulate the real exam
Set aside uninterrupted time and answer as if it were exam day, respecting the time limit.
Learn from mistakes
In the review, focus on the questions you missed and understand why the correct answer is right.
Retake to consolidate
Retake the quiz periodically to reinforce concepts and track your progress in retaining the content.
