SAP C_TS452_2020 Dumps

83 questões3.0 (2 avaliações)105 visualizaçõespor Dutton Training

C_TS452_2020 SAP Certified Application Associate - SAP S/4HANA Sourcing and Procurement

Como funciona

  • • Uma questão por tela, no seu ritmo
  • • Sem limite de tempo
  • • Correção na hora, logo depois de cada questão
  • • Revisão comentada de cada questão
  • • Grátis, sem precisar criar conta

Ficha técnica

Tema
Tecnologia
Questões
83
Tempo
Sem limite de tempo
Autor
Dutton Training
Atualizado em
06/10/2026
Assuntos
Geral

Prévia das questões

Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.

  1. 1 · Geral

    While procuring material from another plant. Which purchasing instrument would you use?

    • A)Normal Procurement process
    • B)Standard purchase order
    • C)STO
    • D)Extended ware house
  2. 2 · Geral

    2. You have to post scrap expenses to a special account. Based on which characteristics can you influence the behaviour of the account determination? Note: There are 2 correct answers to this question

    • A)Plant
    • B)Movement type
    • C)Storage location
    • D)Stock type
  3. 3 · Geral

    While creating a blanket purchase order using item category B. Which tab becomes visible on the PO in this process?

    • A)MRP
    • B)Storage location
    • C)Confirmations
    • D)Limits
  4. 4 · Geral

    What do you need to do if you want MRP live to create planned orders for externally procured materials?

    • A)Implement BAdl PPH_MRP_SOURCING_BADI => SOS_DET_ADJUST
    • B)Set the MRP indicator in the source list of the material to "Not relevant for planning".
    • C)Set the appropriate plant-specific material status
    • D)Change the procurement type of the material
  5. 5 · Geral

    5. Which SAP Fiori design principle has the goal of having one user. one use case, and up to three screens for each application?

    • A)Simple
    • B)Responsive
    • C)Role-based
    • D)Value
  6. 6 · Geral

    The invoice verification clerks are working with the Release Blocked Invoices app. kind of blocked invoices can they use the automatic release function on what basis?

    • A)Invoices blocked automatically
    • B)Invoices blocked due to variances
    • C)Invoices blocked because of an excessive amount
    • D)Invoices blocked manually
  7. 7 · Geral

    Do you maintain the purchasing group in the material master on the following level?

    • A)MRP
    • B)Plant
    • C)Purchasing Requistion
    • D)Client
  8. 8 · Geral

    You want to create a purchase order with reference to a purchase requistion . What controls the linkage between the line item of your purchase order and the purchase requisition ?

    • A)a. Document category
    • B)b. User role
    • C)Document type
    • D)Account assignment
  9. 9 · Geral

    What are some options when working with scheduling agreements? Note: There are 3 correct answers to this question.

    • A)Item category M (Material unknown) can be used in a scheduling agreement.
    • B)A scheduling agreement item is always plant-specific.
    • C)A scheduling agreement can be used for a consignment process.
    • D)Scheduling agreement delivery schedule lines can only be created manually.
    • E)A material master record is optional in a scheduling agreement item.
  10. 10 · Geral

    Your purchasing department works with purchasing info records. You create a purchase order. Which logic does the system use to propose a valid price that is stored in the info record?

    • A)If a valid plant-specific price exists, this is proposed when a purchase order is created for the corresponding plant.
    • B)The system always proposes the price from the last purchase order whose number was copied into the info record
    • C)If there are NO valid conditions maintained in the info record, the system can propose the price from the last purchase order
    • D)The system always proposes the price from the purchasing organization level, if available

E mais 73 questões esperando por você.

Como estudar com este simulado

Simule a prova real

Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.

Aprenda com os erros

Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.

Refazer para consolidação

Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.