E_S4HCON2022 SAP S/4HANA Conversion and SAP System Upgrade
Free dumps E_S4HCON2022 - SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Como funciona
- • Uma questão por tela, no seu ritmo
- • Tempo total de 180 minutos
- • Correção na hora, logo depois de cada questão
- • Revisão comentada de cada questão
- • Grátis, sem precisar criar conta
Ficha técnica
- Tema
- Tecnologia
- Questões
- 63
- Tempo
- 180 min
- Autor
- Dutton Training
- Atualizado em
- 12/10/2026
- Assuntos
- Geral
Prévia das questões
Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.
1 · Geral
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer. Response:
- A)Configure it within transaction ATC
- B)Apply the corresponding SAP note via SAP Note Assistant
- C)Download it from SAP Support Portal
- D)Generate it by analyzing the specific custom code via RFC
2 · Geral
What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct answer.
- A)To make the progress information within SUM UI more accurate
- B)To auto-fill specific fields on selected screens on the SUM UI
- C)To skip selected phases during the SUM run
- D)To repeat specific phases during the SUM run
3 · Geral
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues? There are 2 correct answers to this question.
- A)Release the transport request containing the modification adjustment
- B)Assign the transport request as a modification adjustment transport
- C)Create "modified' versions of the objects that you need to adjust
- D)Manually activate the adjusted dictionary objects
4 · Geral
What do you need to know about the SAP ERP Upgrade and Update Guide? There are 2 correct answers to this question.
- A)It contains a section "free space requirements"
- B)It is target release specific
- C)It is a database-specific document
- D)It contains a troubleshooting section
5 · Geral
Which Guides contain information about SUM phases starting with "EU_CLONE_"? There are 2 correct answers to this question
- A)The SAP S/HANA Conversion Guide
- B)The Application Guide
- C)The major SUM Guide
- D)The DMO Guide
6 · Geral
How does SUM recognize modification adjustment transports from predecessor systems? Please choose the correct answer.
- A)By searching for transport requests named <SID>K0<number>
- B)By searching for transport requests in DIR_TRANS, subdirectory "transport"
- C)By searching for transport requests in the file umodauto.Ist
- D)By searching for transport requests that are assigned to the project SAP_ADJUST
7 · Geral
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade? Please choose the correct answer.
- A)Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU & UC) procedure.
- B)Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure
- C)Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- D)Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
8 · Geral
During a DMO procedure with SUM, after which phase is the repository first available on the target database? Please choose the correct answer
- A)Downtime migration (EU_CLONE_MIG_DT_RUN)
- B)Parallel distribution (PARDIST_SHD)
- C)Uptime migration (EU_CLONE_MIG_UT_RUN)
- D)Shadow repository creation (EU_IMPORT*)
9 · Geral
You want to execute a Unicode Conversion only. Which approach do you need to follow? Please choose the correct answer
- A)SWPM using the Load procedure
- B)SUM without DMO
- C)SWPM using the Backup / Restore procedure
- D)SUM with DMO
10 · Geral
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system.What do you need to consider? Please choose the correct answer.
- A)The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD
- B)The upgrade of the PRD must be finished before you start new development in the DEV.
- C)The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- D)The transport between Unicode and non-Unicode systems is forbidden
E mais 53 questões esperando por você.
Como estudar com este simulado
Simule a prova real
Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.
Aprenda com os erros
Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.
Refazer para consolidação
Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.
