Dumps C_TS452_2021 SAP S/4HANA Sourcing and Procurement
Actual Dumps C_TS452_2021 SAP S/4HANA Sourcing and Procurement
Como funciona
- • Uma questão por tela, no seu ritmo
- • Tempo total de 180 minutos
- • Correção na hora, logo depois de cada questão
- • Revisão comentada de cada questão
- • Grátis, sem precisar criar conta
Ficha técnica
- Tema
- Tecnologia
- Questões
- 80
- Tempo
- 180 min
- Autor
- Dutton Training
- Atualizado em
- 12/10/2026
- Assuntos
- Geral
Prévia das questões
Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.
1 · Geral
There are multiple company codes and plants in your SAP S/4HANA system. You have set the valuation area to plant level. How can you reduce the effort to configure account determination?
- A)You can use the valuation grouping code to group together plants assigned to company codes with the same chart of accounts.
- B)You can use the valuation grouping code to group together plants assigned to company codes with different charts of accounts.
- C)You can use the account grouping code to group together plants assigned to company codes with different charts of accounts
- D)You can use the account grouping code to group together plants assigned to company codes with the same chart of accounts.
2 · Geral
What are some advantages of a stock transport order compared to a stock transfer posting between two plants? Note: There are 3 correct answers to this question.
- A)You can plan delivery costs.
- B)You can create stock transport requisitions via MRP.
- C)You can post goods receipt in consignment.
- D)You can issue from inspection stock.
- E)You can post goods receipt to consumption
3 · Geral
What are the prerequisites for carrying out material requirements planning (MRP) for a plant? Note: There are 2 correct answers to this question.
- A)Assign each storage location of the corresponding plant to an MRP area in Customizing
- B)Maintain plant parameters for the corresponding plant in Customizing.
- C)Maintain planned independent requirements for the materials in the plant.
- D)Maintain MRP data in the material master record for the materials to be planned automatically.
4 · Geral
Which organizational assignment must NOT be maintained when setting up a cross-company-code purchasing organization?
- A)Plant – purchasing group
- B)Reference purchasing organization – purchasing organization
- C)Plant – purchasing organization
- D)Company code – purchasing organization
5 · Geral
What options are available for charts when analyzing a Key Performance Indicator (KPI) report in Purchasing Analytics? Note: There are 2 correct answers to this question.
- A)Export to a spreadsheet.
- B)Import from a spreadsheet.
- C)Change the dimensions that are shown.
- D)Select the CDS view to be used.
6 · Geral
How can you control the account determination for planned delivery costs based on the condition type?
- A)Assign an account key in the condition type.
- B)Assign an account key in the calculation schema.
- C)Assign an account key in the condition record.
- D)Assign an account key in the access sequence.
7 · Geral
For which of the following document categories can you perform an item-wise release in the flexible workflow for purchasing?
- A)Scheduling agreement
- B)Purchase order
- C)Request for quotation
- D)Purchase requisition
8 · Geral
What are some prerequisites to use a stock determination strategy for a material in inventory management? Note: There are 3 correct answers to this question.
- A)Assign a stock determination strategy to the material type in Customizing.
- B)Customize a cross-application strategy for stock determination
- C)Customize a stock determination rule and assign it to the storage type
- D)Assign a stock determination rule to the business transaction in Customizing
- E)Assign a stock determination group in the material master record.
9 · Geral
Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once. What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier? Note: There are 2 correct answers to this question.
- A)Assign a rounding profile in the material master record of the planned material.
- B)Assign the indicator for quota splitting to the lot-sizing procedure being used.
- C)Set a maximum quota quantity in the quota arrangement item for each supplier.
- D)Set a maximum lot size in the quota arrangement item and activate the 1x checkbox.
10 · Geral
Which of the following SAP Fiori apps must you use to set up the following Situation Handling use case: Quantity Deficit in Supplier's Delivery? Note: There are 2 correct answers to this question
- A)Manage Situation Types - Message Based
- B)Manage Teams and Responsibilities
- C)Monitor Situations
- D)Manage Situation Types
E mais 70 questões esperando por você.
Como estudar com este simulado
Simule a prova real
Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.
Aprenda com os erros
Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.
Refazer para consolidação
Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.
