C_TS422_2020 SAP S/4HANA Production Planning and Manufacturing

80 questões180 min0.0 (15 avaliações)120 visualizaçõespor Dutton Training

SAP Cerification Dumps C_TS422_2020 SAP S/4HANA Production Planning and Manufacturing

Como funciona

  • • Uma questão por tela, no seu ritmo
  • • Tempo total de 180 minutos
  • • Correção na hora, logo depois de cada questão
  • • Revisão comentada de cada questão
  • • Grátis, sem precisar criar conta

Ficha técnica

Tema
Tecnologia
Questões
80
Tempo
180 min
Autor
Dutton Training
Atualizado em
06/10/2026
Assuntos
Geral

Prévia das questões

Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.

  1. 1 · Geral

    How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question

    • A)Use quotations for internal and external procurement.
    • B)Use stock transfer reservations for stock transfer.
    • C)Use purchasing costs for automated source prioritization.
    • D)Use purchase orders for external procurement.
    • E)Use run schedule quantities for in-house production.
  2. 2 · Geral

    When can the automatic material availability check occur in a production order? Note: There are 2 correct answers to this question.

    • A)At order release
    • B)At order settlement
    • C)At order creation
    • D)At order confirmation
  3. 3 · Geral

    Which business processes are affected by settings in the order type- dependent parameters? Note: There are 2 correct answers to this question.

    • A)Implement engineering changes.
    • B)Initiate quality inspections
    • C)Select master data.
    • D)Define integration to cost accounting
  4. 4 · Geral

    You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

    • A)Planning without final assembly (50)
    • B)Make-to-order production (20)
    • C)Planning with final assembly (40)
    • D)Planning at assembly level (70)
  5. 5 · Geral

    How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question

    • A)Order-related
    • B)Cost-related
    • C)Milestone-related
    • D)Product-related
  6. 6 · Geral

    Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.

    • A)Bulk materials
    • B)Waste products
    • C)Co-products
    • D)By-products
    • E)Continuous flow materials
  7. 7 · Geral

    What is a work center hierarchy in capacity planning in SAP S/4HANA?

    • A)A group of work centers in a production line being used in sequence for production
    • B)A group of alternative work centers providing a cumulative available capacity for production
    • C)A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
    • D)A group of alternative work centers for production, structured in hierarchy levels by priorities
  8. 8 · Geral

    Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

    • A)When multiple operations are maintained for one product
    • B)When multiple production versions are maintained for one product
    • C)When alternative resources are used within one operation
    • D)When multiple planned orders exist on one resource
  9. 9 · Geral

    Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

    • A)Order (pool) chart
    • B)Capacity requirements chart
    • C)Orders (dispatched) chart
    • D)Work center capacities chart
  10. 10 · Geral

    Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

    • A)Run PP/DS heuristics for repetitive manufacturing.
    • B)Assign planned orders manually in the planning table
    • C)Run MRP with quota arrangement
    • D)Run MRP with automatic selection of production version

E mais 70 questões esperando por você.

Como estudar com este simulado

Simule a prova real

Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.

Aprenda com os erros

Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.

Refazer para consolidação

Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.