C_TS413_2020 SAP S/4HANA Asset Management

80 questões0.0 (13 avaliações)37 visualizaçõespor Dutton Training

C_TS413_2020 - SAP Certified Application Associate - SAP S/4HANA Asset Management

Como funciona

  • • Uma questão por tela, no seu ritmo
  • • Sem limite de tempo
  • • Correção na hora, logo depois de cada questão
  • • Revisão comentada de cada questão
  • • Grátis, sem precisar criar conta

Ficha técnica

Tema
Tecnologia
Questões
80
Tempo
Sem limite de tempo
Autor
Dutton Training
Atualizado em
18/10/2026
Assuntos
Geral

Prévia das questões

Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.

  1. 1 · Geral

    Which SAP UI technology is used for the technicianIs job list?

    • A)Web Dynpro
    • B)Web Dynpro
    • C)SAP GUI for Windows
    • D)SAP GUI for HTML
  2. 2 · Geral

    Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

    • A)In the report Material: Where-Used List
    • B)In the material reservation list in inventory management
    • C)In the single-level list editing function for maintenance orders
    • D)Within a maintenance order
  3. 3 · Geral

    Which statement is correct when planning maintenance work thatis to be carried out by an external company?

    • A)A service master record must always be assigned to the externalorder operation
    • B)In the control key assigned to the order operation, the "Service" indicator must always be activated.
    • C)If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.
    • D)If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  4. 4 · Geral

    Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers tothis question.

    • A)SAP Fiori launchpad only supports SAP UI5 apps.
    • B)SAP GUI transactions can be used in the SAP Fiori launchpad.
    • C)The cloud version can also use SAP GUI for Windows.
    • D)Web Dynpro apps can be used in the SAP Fiori launchpad.
  5. 5 · Geral

    Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question.

    • A)Analyze overdue maintenance orders that have NOT been finally confirmed.
    • B)Display approved purchase requisitions for which NO purchase orders have been generated.
    • C)Display approved purchase requisitions for which purchase orders have been generated.
    • D)Analyze maintenance orders that are still in planning andhave NOT been released.
    • E)Analyze confirmed maintenance orders that have NOT been settled.
  6. 6 · Geral

    What do you need to configure to enable entries in the action log ofan equipment?

    • A)Activate the change documents for the equipment category
    • B)Select the time segment check box for the equipment category.
    • C)Define an additional business view for the equipment category.
    • D)Define the corresponding history-related field for the equipment reference category.
  7. 7 · Geral

    How do you map a counter replacement in SAP S/4HANA Asset Management?

    • A)Create a new measurement document marked as a counter replacement.
    • B)Deactivate the current counter and create a new counter.
    • C)Create a new measurement document and assign a valuationcode for counter replacement.
    • D)Replace the defective piece of equipment to which a counter is assigned.
  8. 8 · Geral

    You want to have several plan dates calculated in a maintenanceplan. Which scheduling parameter do you use?

    • A)Call horizon
    • B)Scheduling period
    • C)Scheduling indicator
    • D)Lead float
  9. 9 · Geral

    The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

    • A)All open reservations are closed when the maintenance order isset to TECO
    • B)Reservations are created only after a material availability checkhas been performed
    • C)For the combination of order type and planner group you can decide when reservations are created
    • D)Open reservations can be cleared when a maintenance order operation is finally confirmed.
  10. 10 · Geral

    You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

    • A)Assign a subordinate piece of equipment.
    • B)Create a measuring point.
    • C)Change a reference location
    • D)Edit classification data and characteristics.
    • E)Assign documents.

E mais 70 questões esperando por você.

Como estudar com este simulado

Simule a prova real

Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.

Aprenda com os erros

Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.

Refazer para consolidação

Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.