C_TPLM40_65 Quality Management with SAP ERP 6.0 EHP5
Certification dumps C_TPLM40_65 Quality Management with SAP ERP 6.0 EHP5
Como funciona
- • Uma questão por tela, no seu ritmo
- • Tempo total de 180 minutos
- • Correção na hora, logo depois de cada questão
- • Revisão comentada de cada questão
- • Grátis, sem precisar criar conta
Ficha técnica
- Tema
- Tecnologia
- Questões
- 242
- Tempo
- 180 min
- Autor
- Dutton Training
- Atualizado em
- 13/10/2026
- Assuntos
- Geral
Prévia das questões
Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.
1 · Geral
In the quality management view in the material master you can maintain the specifications for procurement for the following using the QM control key
- A)Release required
- B)Block inactive
- C)Technical Delivery Terms
- D)Quality Assurance Agreement
- E)Certificate Requirement
2 · Geral
You can record inspection results for an inspection lot, using defect data or characteristic results
- A)Correct
- B)Incorrect
3 · Geral
Which of the following statements accurately describe a client in an SAP system? (More than one answer is true.)
- A)A client has its own database.
- B)A client may represent an entire company
- C)A client represents a completely independent business entity
- D)A client corresponds to a customer.
4 · Geral
The “Post to Inspection Stock” indicator triggers automatic posting in the inspection stock.
- A)Correct
- B)Incorrect
5 · Geral
An inspection characteristic describes the inspection criteria.
- A)Incorrect
- B)Correct
6 · Geral
You can access the usage decision __________. (More than one answer is true.)
- A)Automatically
- B)From results recording
- C)Manual
- D)Using the worklist
7 · Geral
The inspection lot is not created for the ship-to party.
- A)Correct
- B)Incorrect
8 · Geral
The Copy Inspection Results function can support many business processes.
- A)Incorrect
- B)Correct
9 · Geral
Which statements are correct? (More than one answer is true.)
- A)A work center can’t be assigned to the operation in the task list.
- B)Materials, vendors, and customers can be assigned using the inspection plan header.
- C)The plan usage is stored in the inspection plan header.
- D)Test equipment can be assigned directly to an inspection characteristic in an inspection plan.
10 · Geral
An inspection is completed when the usage decision is made.
- A)Correct
- B)Incorrect
E mais 232 questões esperando por você.
Como estudar com este simulado
Simule a prova real
Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.
Aprenda com os erros
Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.
Refazer para consolidação
Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.
