C_TPLM22_67 SAP Project Systems with SAP ERP 6.0 EHP7

174 questões4.0 (2 avaliações)31 visualizaçõespor Dutton Training

Certification Dumps SAP C_TPLM22_67 SAP Project Systems with SAP ERP 6.0 EHP7

Como funciona

  • • Uma questão por tela, no seu ritmo
  • • Sem limite de tempo
  • • Correção na hora, logo depois de cada questão
  • • Revisão comentada de cada questão
  • • Grátis, sem precisar criar conta

Ficha técnica

Tema
Tecnologia
Questões
174
Tempo
Sem limite de tempo
Autor
Dutton Training
Atualizado em
12/10/2026
Assuntos
Geral

Prévia das questões

Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.

  1. 1 · Geral

    What do you call a closed sequence of relationships and activities where you start from an activity and end up back at the same activity by way of relationships? There is 1 correct answer to this question

    • A)Cycle analysis
    • B)Cycle
    • C)Web structures
    • D)Graphics
  2. 2 · Geral

    In resource-related billing if you do not want to bill a customer for a dynamic item, where do you enter this information? There is 1 correct answer to this question

    • A)You can enter in reason code
    • B)You can enter in reference code
    • C)You can enter in reason for rejection
    • D)You can enter in an apportionment reason
  3. 3 · Geral

    How can you distinguish between service activities and external activities while accessing the detailed information for service activities on the external tab page? There are 2 correct answers to this question

    • A)Cost element
    • B)Service exists indicator
    • C)Order unit
    • D)Control key
  4. 4 · Geral

    Which of the following determines the item category assigned in the sales documents? There are 2 correct answers to this question

    • A)Material princing group
    • B)Sales document type
    • C)Material items category group
    • D)Schedule line items
  5. 5 · Geral

    How can material components be assigned to network activities? There are 3 correct answers to this question

    • A)Using the bill of materials transfer
    • B)Using the bill of materials transfer
    • C)Using ProMan
    • D)Using assigned sales order
    • E)Using the internet-based catalog
  6. 6 · Geral

    Assume you have created a sales order for material to which strategy group for assembly processing has been assigned and the system automatically created a so-called assembly order in the background and started assembly processing In this case, the assembly processing omits which stage and generates an operative order directly from the sales order? There is 1 correct answer to this question

    • A)Billing stage
    • B)Scheduling stage
    • C)Delivery stage
    • D)MRP Planning stage
  7. 7 · Geral

    Which of the following postings are possible if you are using execution services to enter commitment and actual costs for items that you planned using Easy Cost Planning? There are 3 correct answers to this question

    • A)Goods receipt
    • B)Internal activity allocation
    • C)Reservations
    • D)Direct process allocation
  8. 8 · Geral

    Workforce Planning in Project System, allows you to assign certain HR resources to activities of a project. Which of the following can be assigned? There are 3 correct answers to this question

    • A)Positions
    • B)Persons
    • C)Organizational units
    • D)Jobs
  9. 9 · Geral

    Which account assignment category is important for non-valuated project stock with WBS and sales order item? There is correct answer to this question

    • A)Q = Quantities and values managed in projects
    • B)E = quantities and values managed in the sales order item
    • C)G = plant stock, values managed using projects
    • D)D = quantities managed using sales order item and values managed in projects
  10. 10 · Geral

    Which indicator do you use to define the characteristics of a WBS element and to specify tasks are performed by the WBS element when the project is executed? There is 1 correct answer to this question

    • A)Project cost indicators
    • B)Operative indicators
    • C)Billing indicators
    • D)Cost indicators

E mais 164 questões esperando por você.

Como estudar com este simulado

Simule a prova real

Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.

Aprenda com os erros

Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.

Refazer para consolidação

Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.