C_FSUTIL_60 SAP Certified Associate Utilities with SAP ERP 6.0
Certification Dumps C_FSUTIL_60 - SAP Certified Associate - Utilities with SAP ERP 6.0
Como funciona
- • Uma questão por tela, no seu ritmo
- • Tempo total de 180 minutos
- • Correção na hora, logo depois de cada questão
- • Revisão comentada de cada questão
- • Grátis, sem precisar criar conta
Ficha técnica
- Tema
- Tecnologia
- Questões
- 80
- Tempo
- 180 min
- Autor
- Dutton Training
- Atualizado em
- 13/10/2026
- Assuntos
- Geral
Prévia das questões
Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.
1 · Geral
A customer moves in to a premise and requests electricity service starting on June 7. According to the schedule records, the scheduled meter reading date is June 29, the scheduled billing date is July 1, and the allocation date for billing is June 30. Given that batch billing is executed every night with all portions included, what is the first day the customer's contract could be billed?
- A)July 1
- B)June 30
- C)June 7
- D)June 29
2 · Geral
On May 15, you try to process dunning for an account with an issue date of May 10. Why does dunning fail to produce a result?
- A)A dunning block which expired on May 13 was set on the contract account.
- B)A dunning block which expired on May 13 was set on the business partner
- C)A dunning block which began on May 13 was set on the business partner.
- D)A dunning block which began on May 13 was set on the contract account.
3 · Geral
Which object can be used in monitoring (EL31) to view meter reading results?
- A)Contract
- B)Device location
- C)Connection object
- D)Contract account
4 · Geral
Which criteria are used to group the underlying FICA documents for transfer to General Ledger Accounting? (Choose three.)
- A)Creation date
- B)Currency
- C)Transaction
- D)Segment
- E)Company code
5 · Geral
Which processes can be directly called within the account display transaction? (Choose three.)
- A)Change contract
- B)Display returns history
- C)Mass change
- D)Create budget billing plan
- E)Display installation
6 · Geral
Which of the following must exist before an agent can create an automatic billing document?
- A)Validated meter reading result
- B)Posted payment
- C)Billable billing order
- D)Active budget billing plan
7 · Geral
A tariff requires that for the same contract account, the consumption from the water meter is used to bill the water consumption charge and the waste water consumption charge. How can the water meter be installed to meet this tariff requirement?
- A)Technically installed to waste installation; billing installed to water installation.
- B)Fully installed to water installation; technically installed to waste water installation.
- C)Fully installed to water installation; billing installed to waste water installation.
- D)Technically installed to water installation; billing installed to waste water installation.
8 · Geral
You enter a meter reading manually and receive a message informing you that the reading failed a relative tolerance validation. What type of meter reading validation is this?
- A)Meter reading control validation
- B)Fixed validation
- C)Independent validation
- D)Dependent validation
9 · Geral
What is the required technical master data for the SAP IS-U move-in?
- A)• Connection object • Installation • Premise
- B)• Contract account • Installation • Premise
- C)• Contract • Installation • Premise
- D)• Connection object • Installation • Device
10 · Geral
A financial clerk is posting an FI-CA document. Which scenarios can be posted? (Choose three.)
- A)The document has statistical general ledger items totaling $25
- B)The document has one statistical business partner item totaling $25.
- C)The document has two business partner items totaling 25.
- D)The document has two business partner items totaling 25
- E)The document has two business partner items totaling 25.
E mais 70 questões esperando por você.
Como estudar com este simulado
Simule a prova real
Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.
Aprenda com os erros
Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.
Refazer para consolidação
Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.
