PMP Project Management Professional v2020 2

80 questões sorteadas de 49913 visualizaçõespor Dutton Training

PMP Project Management Professional v2020 2

Como funciona

  • • Uma questão por tela, no seu ritmo
  • • Sem limite de tempo
  • • Correção na hora, logo depois de cada questão
  • • Revisão comentada de cada questão
  • • Grátis, sem precisar criar conta

Ficha técnica

Tema
Tecnologia
Questões
499
Tempo
Sem limite de tempo
Autor
Dutton Training
Atualizado em
16/10/2026
Assuntos
Geral

Prévia das questões

Confira os enunciados das primeiras 10 questões. O gabarito aparece apenas ao fazer o simulado.

  1. 1 · Geral

    Configuration identification, configuration status accounting, and configuration verification and audit are all activities in which process?

    • A)Perform Quality Assurance
    • B)Direct and Manage Project Work
    • C)Monitor and Control Project Work
    • D)Perform Integrated Change Control
  2. 2 · Geral

    Which tool or technique is used in the Estimate Costs process?

    • A)Acquisition
    • B)Earned value management
    • C)Vendor bid analysis
    • D)Forecasting
  3. 3 · Geral

    Which tool or technique is used in the Perform Integrated Change Control process?

    • A)Decomposition
    • B)Modeling techniques
    • C)Resource optimization
    • D)Meetings
  4. 4 · Geral

    Which type of contract gives both the seller and the buyer flexibility to deviate from performance with financial incentives?

    • A)Cost Plus Incentive Fee (CPIF)
    • B)Fixed Price Incentive Fee (FPIF)
    • C)Cost Pius Award Re (CPAF)
    • D)Time and Material (T&M)
  5. 5 · Geral

    The degree, amount, or volume of risk that an organization or individual will withstand is known as its risk:

    • A)Analysis
    • B)Appetite
    • C)ToleranceD. Response
  6. 6 · Geral

    During which process does the project team receive bids and proposals?

    • A)Conduct Procurements
    • B)Plan Procurements
    • C)Estimate Costs
    • D)Control Budget
  7. 7 · Geral

    Which output is the approved version of the time-phased project budget?

    • A)Resource calendar
    • B)Scope baseline
    • C)Trend analysis
    • D)Cost baseline
  8. 8 · Geral

    The purpose of the Project Communications Management Knowledge Area is to:

    • A)Monitor and control communications throughout the entire project life cycle.
    • B)Maintain an optimal flow of information among all project participants.
    • C)Develop an appropriate approach for project communications.
    • D)Ensure timely and appropriate collection of project information.
  9. 9 · Geral

    Specification of both the deliverables and the processes is the focus of:

    • A)Change control
    • B)Configuration control
    • C)Project monitoring and control
    • D)Issue control
  10. 10 · Geral

    Which key interpersonal skill of a project manager is defined as the strategy of sharing power and relying on interpersonal skills to convince others to cooperate toward common goals?

    • A)Collaboration
    • B)Negotiation
    • C)Decision making
    • D)Influencing

E mais 489 questões esperando por você.

Como estudar com este simulado

Simule a prova real

Reserve um momento sem interrupções e responda como se estivesse no dia da prova, respeitando o tempo.

Aprenda com os erros

Na revisão, concentre-se nas questões que errou e entenda por que a alternativa correta é a certa.

Refazer para consolidação

Refaça o simulado periodicamente para fixar os conceitos e acompanhar sua evolução na retenção dos conteúdos.