Vista previa de las preguntas

Revisa las primeras 10 preguntas. Las respuestas aparecen solo al hacer el simulacro.

  1. 1 · Geral

    Which product records any project outcomes perceived as negative by stakeholders?

    • A)Business Case
    • B)Project Plan
    • C)Communication Management Strategy
    • D)Project Product Description
  2. 2 · Geral

    What is the definition of a project outcome?

    • A)A measurable improvement that is perceived as an advantage by one or more stakeholders
    • B)The reason for the project
    • C)The result of the change derived from using the project's outputs
    • D)The project's specialist products.
  3. 3 · Geral

    Which is NOT a purpose of a Benefits Review Plan?

    • A)Define the period over which the cost-benefit analysis will be based
    • B)Describe how to measure the performance of the project's products in operational use
    • C)Define the scope, timing and ownership of the benefit reviews required
    • D)Describe how to measure and confirm any benefits that are to be realised after the project is closed
  4. 4 · Geral

    Which product documents the information needed to demonstrate continued business justification?

    • A)Business Case
    • B)Communication Management Strategy
    • C)Project Product Description
    • D)Quality Management Strategy
  5. 5 · Geral

    Which is NOT a purpose of a Benefits Review Plan?

    • A)Define the period over which the cost-benefit analysis will be based
    • B)Describe how to measure the performance of the project's products in operational use
    • C)Define the scope, timing and ownership of the benefit reviews required
    • D)Describe how to measure and confirm any benefits that are to be realised after the project is closed
  6. 6 · Geral

    What is an off-specification?

    • A)A new requirement
    • B)A quality tolerance
    • C)A type of issue
    • D)A major risk
  7. 7 · Geral

    Which is a type of issue?

    • A)A lesson
    • B)A request for change
    • C)An Exception Report
    • D)A risk with an estimated high impact
  8. 8 · Geral

    Which is a typical core activity within configuration management?

    • A)Quality assurance
    • B)Risk management
    • C)Verification and audit
    • D)Progress reporting
  9. 9 · Geral

    Which is a typical core activity within configuration management?

    • A)Issue management
    • B)Quality inspection
    • C)Identification
    • D)Preparation
  10. 10 · Geral

    What needs to be in place to ensure effective issue and change control?

    • A)Configuration management system
    • B)Manage by exception
    • C)Quality planning
    • D)Information needs for stakeholders

Y 190 preguntas más esperándote.

Cómo estudiar con este simulacro

Simula el examen real

Reserva un momento sin interrupciones y responde como si fuera el día del examen, respetando el tiempo.

Aprende de los errores

En la revisión, concéntrate en las preguntas que fallaste y entiende por qué la respuesta correcta lo es.

Rehacer para consolidar

Rehaz el simulacro periódicamente para fijar los conceptos y seguir tu evolución en la retención de los contenidos.