PMP Project Management Professional v2020 2

80 preguntas sorteadas de 49913 visitaspor Dutton Training

PMP Project Management Professional v2020 2

Cómo funciona

  • • Una pregunta por pantalla, a tu ritmo
  • • Sin límite de tiempo
  • • Corrección al instante después de cada pregunta
  • • Repaso comentado de cada pregunta
  • • Gratis, sin necesidad de crear cuenta

Ficha técnica

Tema
Tecnologia
Preguntas
499
Tiempo
Sin límite de tiempo
Autor
Dutton Training
Actualizado el
16/10/2026
Temas
Geral

Vista previa de las preguntas

Revisa las primeras 10 preguntas. Las respuestas aparecen solo al hacer el simulacro.

  1. 1 · Geral

    Configuration identification, configuration status accounting, and configuration verification and audit are all activities in which process?

    • A)Perform Quality Assurance
    • B)Direct and Manage Project Work
    • C)Monitor and Control Project Work
    • D)Perform Integrated Change Control
  2. 2 · Geral

    Which tool or technique is used in the Estimate Costs process?

    • A)Acquisition
    • B)Earned value management
    • C)Vendor bid analysis
    • D)Forecasting
  3. 3 · Geral

    Which tool or technique is used in the Perform Integrated Change Control process?

    • A)Decomposition
    • B)Modeling techniques
    • C)Resource optimization
    • D)Meetings
  4. 4 · Geral

    Which type of contract gives both the seller and the buyer flexibility to deviate from performance with financial incentives?

    • A)Cost Plus Incentive Fee (CPIF)
    • B)Fixed Price Incentive Fee (FPIF)
    • C)Cost Pius Award Re (CPAF)
    • D)Time and Material (T&M)
  5. 5 · Geral

    The degree, amount, or volume of risk that an organization or individual will withstand is known as its risk:

    • A)Analysis
    • B)Appetite
    • C)ToleranceD. Response
  6. 6 · Geral

    During which process does the project team receive bids and proposals?

    • A)Conduct Procurements
    • B)Plan Procurements
    • C)Estimate Costs
    • D)Control Budget
  7. 7 · Geral

    Which output is the approved version of the time-phased project budget?

    • A)Resource calendar
    • B)Scope baseline
    • C)Trend analysis
    • D)Cost baseline
  8. 8 · Geral

    The purpose of the Project Communications Management Knowledge Area is to:

    • A)Monitor and control communications throughout the entire project life cycle.
    • B)Maintain an optimal flow of information among all project participants.
    • C)Develop an appropriate approach for project communications.
    • D)Ensure timely and appropriate collection of project information.
  9. 9 · Geral

    Specification of both the deliverables and the processes is the focus of:

    • A)Change control
    • B)Configuration control
    • C)Project monitoring and control
    • D)Issue control
  10. 10 · Geral

    Which key interpersonal skill of a project manager is defined as the strategy of sharing power and relying on interpersonal skills to convince others to cooperate toward common goals?

    • A)Collaboration
    • B)Negotiation
    • C)Decision making
    • D)Influencing

Y 489 preguntas más esperándote.

Cómo estudiar con este simulacro

Simula el examen real

Reserva un momento sin interrupciones y responde como si fuera el día del examen, respetando el tiempo.

Aprende de los errores

En la revisión, concéntrate en las preguntas que fallaste y entiende por qué la respuesta correcta lo es.

Rehacer para consolidar

Rehaz el simulacro periódicamente para fijar los conceptos y seguir tu evolución en la retención de los contenidos.