Dumps C_TS452_2021 SAP S/4HANA Sourcing and Procurement

80 preguntas180 min0.0 (56 valoraciones)259 visitaspor Dutton Training

Actual Dumps C_TS452_2021 SAP S/4HANA Sourcing and Procurement

Cómo funciona

  • • Una pregunta por pantalla, a tu ritmo
  • • Tiempo total de 180 minutos
  • • Corrección al instante después de cada pregunta
  • • Repaso comentado de cada pregunta
  • • Gratis, sin necesidad de crear cuenta

Ficha técnica

Tema
Tecnologia
Preguntas
80
Tiempo
180 min
Autor
Dutton Training
Actualizado el
31/10/2026
Temas
Geral

Vista previa de las preguntas

Revisa las primeras 10 preguntas. Las respuestas aparecen solo al hacer el simulacro.

  1. 1 · Geral

    There are multiple company codes and plants in your SAP S/4HANA system. You have set the valuation area to plant level. How can you reduce the effort to configure account determination?

    • A)You can use the valuation grouping code to group together plants assigned to company codes with the same chart of accounts.
    • B)You can use the valuation grouping code to group together plants assigned to company codes with different charts of accounts.
    • C)You can use the account grouping code to group together plants assigned to company codes with different charts of accounts
    • D)You can use the account grouping code to group together plants assigned to company codes with the same chart of accounts.
  2. 2 · Geral

    What are some advantages of a stock transport order compared to a stock transfer posting between two plants? Note: There are 3 correct answers to this question.

    • A)You can plan delivery costs.
    • B)You can create stock transport requisitions via MRP.
    • C)You can post goods receipt in consignment.
    • D)You can issue from inspection stock.
    • E)You can post goods receipt to consumption
  3. 3 · Geral

    What are the prerequisites for carrying out material requirements planning (MRP) for a plant? Note: There are 2 correct answers to this question.

    • A)Assign each storage location of the corresponding plant to an MRP area in Customizing
    • B)Maintain plant parameters for the corresponding plant in Customizing.
    • C)Maintain planned independent requirements for the materials in the plant.
    • D)Maintain MRP data in the material master record for the materials to be planned automatically.
  4. 4 · Geral

    Which organizational assignment must NOT be maintained when setting up a cross-company-code purchasing organization?

    • A)Plant – purchasing group
    • B)Reference purchasing organization – purchasing organization
    • C)Plant – purchasing organization
    • D)Company code – purchasing organization
  5. 5 · Geral

    What options are available for charts when analyzing a Key Performance Indicator (KPI) report in Purchasing Analytics? Note: There are 2 correct answers to this question.

    • A)Export to a spreadsheet.
    • B)Import from a spreadsheet.
    • C)Change the dimensions that are shown.
    • D)Select the CDS view to be used.
  6. 6 · Geral

    How can you control the account determination for planned delivery costs based on the condition type?

    • A)Assign an account key in the condition type.
    • B)Assign an account key in the calculation schema.
    • C)Assign an account key in the condition record.
    • D)Assign an account key in the access sequence.
  7. 7 · Geral

    For which of the following document categories can you perform an item-wise release in the flexible workflow for purchasing?

    • A)Scheduling agreement
    • B)Purchase order
    • C)Request for quotation
    • D)Purchase requisition
  8. 8 · Geral

    What are some prerequisites to use a stock determination strategy for a material in inventory management? Note: There are 3 correct answers to this question.

    • A)Assign a stock determination strategy to the material type in Customizing.
    • B)Customize a cross-application strategy for stock determination
    • C)Customize a stock determination rule and assign it to the storage type
    • D)Assign a stock determination rule to the business transaction in Customizing
    • E)Assign a stock determination group in the material master record.
  9. 9 · Geral

    Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once. What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier? Note: There are 2 correct answers to this question.

    • A)Assign a rounding profile in the material master record of the planned material.
    • B)Assign the indicator for quota splitting to the lot-sizing procedure being used.
    • C)Set a maximum quota quantity in the quota arrangement item for each supplier.
    • D)Set a maximum lot size in the quota arrangement item and activate the 1x checkbox.
  10. 10 · Geral

    Which of the following SAP Fiori apps must you use to set up the following Situation Handling use case: Quantity Deficit in Supplier's Delivery? Note: There are 2 correct answers to this question

    • A)Manage Situation Types - Message Based
    • B)Manage Teams and Responsibilities
    • C)Monitor Situations
    • D)Manage Situation Types

Y 70 preguntas más esperándote.

Cómo estudiar con este simulacro

Simula el examen real

Reserva un momento sin interrupciones y responde como si fuera el día del examen, respetando el tiempo.

Aprende de los errores

En la revisión, concéntrate en las preguntas que fallaste y entiende por qué la respuesta correcta lo es.

Rehacer para consolidar

Rehaz el simulacro periódicamente para fijar los conceptos y seguir tu evolución en la retención de los contenidos.