C_TPLM30_67 SAP Maintenance & Repair with ERP 6.0 EHP7
Certification Dumps C_TPLM30_67 SAP Maintenance & Repair with ERP 6.0 EHP7
Cómo funciona
- • Una pregunta por pantalla, a tu ritmo
- • Tiempo total de 180 minutos
- • Corrección al instante después de cada pregunta
- • Repaso comentado de cada pregunta
- • Gratis, sin necesidad de crear cuenta
Ficha técnica
- Tema
- Tecnologia
- Preguntas
- 61
- Tiempo
- 180 min
- Autor
- Dutton Training
- Actualizado el
- 12/10/2026
- Temas
- Geral
Vista previa de las preguntas
Revisa las primeras 10 preguntas. Las respuestas aparecen solo al hacer el simulacro.
1 · Geral
Your customer executes deadline monitoring (transaction IP30). What happens after you insert additional call dates using the manual call function?
- A)The system restarts the maintenance plan.
- B)The system retains the normal scheduled call dates.
- C)The system fixes the next scheduled call date.
- D)The system reschedules all previous scheduled call dates.
2 · Geral
Your customer wants to settle costs of the refurbishment process to an inventory account. What Customizing does the process require? (Choose two.)
- A)Special control keys for use in refurbishment operations.
- B)A specific order type for refurbishment processing.
- C)A specific settlement profile for the purpose of refurbishment.
- D)A specific notification type for refurbishment processing.
3 · Geral
You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed. Which system statuses can the order header display before all operations are finally confirmed? (Choose three.)
- A)TECO
- B)PCNF
- C)CRTD
- D)CNF
- E)CLSD
4 · Geral
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?
- A)Planned costs overwrite estimated costs after release of the order.
- B)A specific order type in which cost estimates are activated must be used.
- C)Planned costs must not exceed the estimated costs.
- D)Upon release of the order, estimated costs cannot be revised.
5 · Geral
What are the two options available for archiving order? (Choose two.)
- A)Manually enter historical orders
- B)Recognize orders
- C)Order settlement
- D)Refurbishment
- E)Copy orders
6 · Geral
In order costing, what is the allocation structure used for?
- A)To provide a hierarchy structure for posting costs to the general ledger.
- B)To provide a structure to summarize postings across cost elements.
- C)To determine the cost element for debit to the order and credit from the order.
- D)To determine the overhead costs that need to be applied to each cost element.
7 · Geral
Find out the elements responsible for performance management. (Choose three.)
- A)Investment planning
- B)Project definition
- C)Execution
- D)ispatchE. Ordering
8 · Geral
What do you need to select when you create a maintenance plan that only generates notification(s)?
- A)A maintenance plan category for notifications.
- B)A specific notification type for maintenance plans.
- C)A specific notification type that includes a task list.
- D)A specific maintenance strategy for notifications.
9 · Geral
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item. How can a user override the automatic release of the order without creating a new order type?
- A)Select a maintenance planner group and set the Do Not Release Immediately indicator.
- B)Set the Do Not Release Immediately indicator in the task list header.
- C)Set the Do Not Release Immediately indicator in planning data for the maintenance item.
- D)Select a maintenance activity type and set the Do Not Release Immediately indicator.
10 · Geral
For which business requirements must you use serial numbers? (Choose two.)
- A)To uniquely identify inventory material items.
- B)To have a future option to track material items as pieces of functional locations
- C)To have a future option to track material items as pieces of equipment.
- D)To have the option to track batches.
Y 51 preguntas más esperándote.
Cómo estudiar con este simulacro
Simula el examen real
Reserva un momento sin interrupciones y responde como si fuera el día del examen, respetando el tiempo.
Aprende de los errores
En la revisión, concéntrate en las preguntas que fallaste y entiende por qué la respuesta correcta lo es.
Rehacer para consolidar
Rehaz el simulacro periódicamente para fijar los conceptos y seguir tu evolución en la retención de los contenidos.
